A two-stage iterated greedy algorithm and a multi-objective constructive heuristic for the mixed no-idle flowshop scheduling problem to minimize makespan subject to total completion time
Advanced production systems usually are complex in nature and aim to deal with multiple Zinc performance measures simultaneously.Therefore, in most cases, the consideration of a single objective function is not sufficient to properly solve scheduling problems.This paper investigates the multi-objective mixed no-idle flowshop scheduling problem.The